    Abstract

    This paper presents the results of investigations of the Transient Recovery Voltage (TRV) across the terminals of the main 132kV Line Bay GIS circuit breaker (GIS CB) for Walney 2, second phase of the Walney Offshore Wind Farm. Several simulations were performed where the influence of different parameters in the network was evaluated during a fault in the onshore substation. The rate of rise of recovery voltage (RRRV) and the maximum crest voltage (Uc) of the TRV across the GIS CB were compared against the standard values based on the type test results from the GIS. The investigations were performed by means of time domain simulations using the EMT software PSCAD/HVDC. Based on the results, it was concluded that the highest RRRV appears on a system without additional stray capacitances, and the highest Uc appears when the fault is a single phase to ground.
    Original languageEnglish
    Title of host publicationEuropean Offshore Wind Conference and Exibition 2011 : Proceedings
    Publication date2011
    Publication statusPublished - 2011
    EventOffshore 2011 - Amsterdam, Netherlands
    Duration: 29 Nov 20111 Dec 2011

    Conference

    ConferenceOffshore 2011
    Country/TerritoryNetherlands
    CityAmsterdam
    Period29/11/201101/12/2011

    Keywords

    • Transient Recovery Voltage
    • EMT simulations
    • Faults