Site Calibration report

Research output: Book/ReportReportResearch

Abstract

The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1].
The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [2].
The possible measurement sector for power performance according to [1] is also described in [2] and no results from the site calibration have shown any necessary exclusion from this sector.
All parts of the sensors and the measurement system have been installed by DTU.
Original languageEnglish
PublisherDTU Wind Energy
Number of pages64
Publication statusPublished - 2014
SeriesDTU Wind Energy WTT I
Number1062(EN)

Bibliographical note

This is an internal report and therefore not available in full text. Please contact author's or director of author's institute for further information.

Keywords

  • DTU Wind Energy WTT I-1062(EN)
  • WTT-I-1062
  • WTT-I-1062(EN)

Cite this

Yordanova, G., & Vesth, A. (2014). Site Calibration report. DTU Wind Energy. DTU Wind Energy WTT I, No. 1062(EN)
Yordanova, Ginka ; Vesth, Allan. / Site Calibration report. DTU Wind Energy, 2014. 64 p. (DTU Wind Energy WTT I; No. 1062(EN)).
@book{e0feadabea674dd3a34630cfd29da87b,
title = "Site Calibration report",
abstract = "The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1].The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [2].The possible measurement sector for power performance according to [1] is also described in [2] and no results from the site calibration have shown any necessary exclusion from this sector.All parts of the sensors and the measurement system have been installed by DTU.",
keywords = "DTU Wind Energy WTT I-1062(EN), WTT-I-1062, WTT-I-1062(EN)",
author = "Ginka Yordanova and Allan Vesth",
note = "This is an internal report and therefore not available in full text. Please contact author's or director of author's institute for further information.",
year = "2014",
language = "English",
publisher = "DTU Wind Energy",
address = "Denmark",

}

Yordanova, G & Vesth, A 2014, Site Calibration report. DTU Wind Energy WTT I, no. 1062(EN), DTU Wind Energy.

Site Calibration report. / Yordanova, Ginka; Vesth, Allan.

DTU Wind Energy, 2014. 64 p. (DTU Wind Energy WTT I; No. 1062(EN)).

Research output: Book/ReportReportResearch

TY - RPRT

T1 - Site Calibration report

AU - Yordanova, Ginka

AU - Vesth, Allan

N1 - This is an internal report and therefore not available in full text. Please contact author's or director of author's institute for further information.

PY - 2014

Y1 - 2014

N2 - The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1].The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [2].The possible measurement sector for power performance according to [1] is also described in [2] and no results from the site calibration have shown any necessary exclusion from this sector.All parts of the sensors and the measurement system have been installed by DTU.

AB - The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1].The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [2].The possible measurement sector for power performance according to [1] is also described in [2] and no results from the site calibration have shown any necessary exclusion from this sector.All parts of the sensors and the measurement system have been installed by DTU.

KW - DTU Wind Energy WTT I-1062(EN)

KW - WTT-I-1062

KW - WTT-I-1062(EN)

M3 - Report

BT - Site Calibration report

PB - DTU Wind Energy

ER -

Yordanova G, Vesth A. Site Calibration report. DTU Wind Energy, 2014. 64 p. (DTU Wind Energy WTT I; No. 1062(EN)).