Site Calibration, FGW

Carsten Weber Kock, Allan Vesth

Research output: Book/ReportReportResearch

Abstract

This Site Calibration report is describing the results of a measured site calibration for a site in Denmark. The calibration is carried out by DTU Wind Energy in accordance with Ref.[3] and Ref.[4]. The measurement period is given. The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [1] and [2]. All parts of the sensors and the measurement system have been installed by DTU Wind Energy.
Original languageEnglish
PublisherDTU Wind Energy
Number of pages60
Publication statusPublished - 2013
SeriesDTU Wind Energy WTT I
Number1031(EN)

Bibliographical note

This is an internal report and therefore not available in full text. Please contact author's or director of author's institute for further information.

Keywords

  • DTU Wind Energy WTT I-1031(EN)
  • WTT-I-1031
  • WTT-I-1031(EN)

Cite this

Kock, C. W., & Vesth, A. (2013). Site Calibration, FGW. DTU Wind Energy. DTU Wind Energy WTT I, No. 1031(EN)