Site calibration

Research output: Book/ReportReport

Abstract

The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1].
The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [2].
The possible measurement sector for power performance according to [1] is also described in [2] and no results from the site calibration have shown any necessary exclusion from this sector.
All parts of the sensors and the measurement system have been installed by DTU.
Original languageEnglish
PublisherDTU Wind Energy
Number of pages66
Publication statusPublished - 2015
SeriesDTU Wind Energy WTT I
Number1135(EN)

Bibliographical note

This is an internal report and therefore not available in full text. Please contact author's or director of author's department for further information.

Keywords

  • DTU Wind Energy WTT I-1135(EN)
  • WTT-I-1135
  • WTT-I-1135(EN)

Fingerprint Dive into the research topics of 'Site calibration'. Together they form a unique fingerprint.

Cite this