@book{60114de2061d46a09d53f261df0b2d56,
title = "Site Calibration",
abstract = "This Site Calibration report is describing the results of a measured site calibration for a site in Denmark. The calibration is carried out by DTU Wind Energy in accordance with Ref.[3] and Ref.[4]. The measurement period is given. The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio between the wind speed at the center of the turbine hub and at the met mast. The wind speed at the turbine is measured by a temporary mast placed at the foundation for the turbine. The site and measurement equipment is detailed described in [1] and [2]. All parts of the sensors and the measurement system have been installed by DTU Wind Energy.",
keywords = " DTU Wind Energy WTT I-1047(EN), WTT-I-1047, WTT-I-1047(EN)",
author = "Kock, {Carsten Weber} and Allan Vesth",
note = "This is an internal report and therefore not available in full text. Please contact author's or director of author's institute for further information.",
year = "2013",
language = "English",
series = "DTU Wind Energy WTT I",
number = "1047(EN)",
publisher = "DTU Wind Energy",
address = "Denmark",
}