Projects per year
Abstract
Within IRP ELECTRA six control schemes were developed to control power system voltage and balancing (frequency) in the Web-of-Cells architecture. This document summarizes and presents simulations proving that the Web-of-Cells can be controlled in a stable way by each of these six control schemes in stand-alone mode.
Original language | English |
---|
Publisher | ELECTRA Consortium |
---|---|
Number of pages | 108 |
Publication status | Published - 2018 |
Fingerprint
Dive into the research topics of 'Simulations based evaluation of the ELECTRA WoC solutions for voltage and balance control - Stand-alone Use Case simulation results'. Together they form a unique fingerprint.Projects
- 1 Finished
-
ELECTRA Top-Up
Marinelli, M. (PI), Bindner, H. W. (Project Participant), Pertl, M. G. (PhD Student) & Rezkalla, M. M. N. (PhD Student)
Energiteknologisk Udviklings- og Demonstrationsprogram
01/11/2014 → 31/10/2017
Project: Research