Scan-to-BIM in the pre-design phase

Research output: Contribution to journalJournal articleResearchpeer-review

247 Downloads (Pure)

Abstract

The high demand for energy-efficiency of buildings nowadays has triggered the need for gathering documentation on existing construction conditions. This information is then used to design buildings with high consideration to the site or to allow the renovation of old buildings that can no longer meet the requirements for energy performance or comfortable living. The documentation required for this type of situation is often outdated or missing, and to create an optimal design the existing conditions need to be registered and analysed using advanced technological methods, such as Building Information Modelling (BIM) and 3D laser scanning.
Original languageEnglish
JournalGIM International
Volume31
Issue number8
Pages (from-to)34-37
Publication statusPublished - 2017

Fingerprint

Dive into the research topics of 'Scan-to-BIM in the pre-design phase'. Together they form a unique fingerprint.

Cite this