Requirements for future control room and visualisation features in the Web-of-Cells framework defined in the ELECTRA project

Carlo Tornelli, Roberto Zuelli, Mattia Marinelli, Andrei Z. Morch, Laurence Cornez

    Research output: Contribution to journalJournal articleResearchpeer-review

    317 Downloads (Orbit)

    Abstract

    This study outlines an overview of the general requirements for the control rooms of the future power systems (2030+). The roles and activities in the future control centres will evolve with respect to the switching, dispatching and restoration functions currently active. The control centre operators will supervise on the power system and intervene - when necessary - thanks to the maturation and wide scale deployment of flexible controls. For the identification of control room requirements, general trends in power system evolution are considered and mainly the outcomes of the ELECTRA IRP project, that proposes a new Web-of-Cell (WoC) power system control architecture. Dedicated visualisation features are proposed, aimed to support the control room operators activities in a WoC-oriented approach. Furthermore, the work takes into account the point of view of network operators about future control rooms and feedback about the proposed visualisation features, collected by means of interviews and questionnaires.
    Original languageEnglish
    JournalCired - Open Access Proceedings Journal
    Volume2017
    Issue number1
    Pages (from-to)1425-8
    Number of pages4
    ISSN2515-0855
    DOIs
    Publication statusPublished - 2017

    Bibliographical note

    This is an open access article published by the IET under the Creative Commons Attribution License (http://creativecommons.org/licenses/by/3.0/)

    Fingerprint

    Dive into the research topics of 'Requirements for future control room and visualisation features in the Web-of-Cells framework defined in the ELECTRA project'. Together they form a unique fingerprint.

    Cite this