The refrigeration system in a supermarket is an important part of the business for the supermarkets, both in terms of the possibility it provides and because of the associated cost of operating the system. It provides the possibility of selling
chilled and frozen food but on the other hand the operation of the refrigeration system is associated with a signicant cost. Cost ecient operation of the refrigeration system is therefore very important for the supermarkets. To ensure
that the systems are operated cost efficient a performance assessment scheme is required. In addition, there exists a need for algorithms that ensures or improves the performance of the system. A supermarket refrigeration system is usually a complex and distributed control system, and it can therefore be difficult to assess the performance without
a formal method. The main interest for a supermarket, with respect to the refrigeration system, is to optimise the total cost of ownership, (TCO). However, directly measuring TCO provides some challenges. It can therefore be beneficial
to divide TCO into performance criteria, which can be quantied and measured. For supermarket refrigeration systems the performance criteria can be divided into three categories: quality-, energy- and reliability-related criteria. Hence,
it is important to operate the refrigeration system such that it ensures good quality of the stored goods as energy ecient as possible without compromising the reliability of the system. A performance function that quanties and measure the criteria has been developed in this project. The quality is measured by the control errors in the system because there is a connection between the quality of the stored goods and the ability of the refrigeration system to provide the required temperature. A deviation from the controller set-point corresponds to a temperature deviation,which will eventually harm the stored goods. The energy eciency is measured by the coecient of performance, COP, which basically is the delivered cooling power divided by the consumed electrical power of the system. The reliability criteria is measure by the switch frequency of the compressors in the refrigeration system. The reason is that excessive compressor switching will wear down the compressors too fast and thereby decrease the reliability of the system due to a higher demand for maintenance. The proposed performance function provides a method for assessing the operational performance at a plan-wide level and is therefore providing a tool for improving the plant-wide performance. The performance function has been used in dierent setups to improve the performance of the refrigeration system. Static and the dynamic performance of the refrigeration system has been addressed in the project. The proposed methods for improvement relies on a minimum of detailed knowledge about the refrigeration system. In addition, since a refrigeration system often operates in steady state an active system monitoring setup has been proposed, to enable improvement of the dynamic performance.
chilled and frozen food but on the other hand the operation of the refrigeration system is associated with a signicant cost. Cost ecient operation of the refrigeration system is therefore very important for the supermarkets. To ensure
that the systems are operated cost efficient a performance assessment scheme is required. In addition, there exists a need for algorithms that ensures or improves the performance of the system. A supermarket refrigeration system is usually a complex and distributed control system, and it can therefore be difficult to assess the performance without
a formal method. The main interest for a supermarket, with respect to the refrigeration system, is to optimise the total cost of ownership, (TCO). However, directly measuring TCO provides some challenges. It can therefore be beneficial
to divide TCO into performance criteria, which can be quantied and measured. For supermarket refrigeration systems the performance criteria can be divided into three categories: quality-, energy- and reliability-related criteria. Hence,
it is important to operate the refrigeration system such that it ensures good quality of the stored goods as energy ecient as possible without compromising the reliability of the system. A performance function that quanties and measure the criteria has been developed in this project. The quality is measured by the control errors in the system because there is a connection between the quality of the stored goods and the ability of the refrigeration system to provide the required temperature. A deviation from the controller set-point corresponds to a temperature deviation,which will eventually harm the stored goods. The energy eciency is measured by the coecient of performance, COP, which basically is the delivered cooling power divided by the consumed electrical power of the system. The reliability criteria is measure by the switch frequency of the compressors in the refrigeration system. The reason is that excessive compressor switching will wear down the compressors too fast and thereby decrease the reliability of the system due to a higher demand for maintenance. The proposed performance function provides a method for assessing the operational performance at a plan-wide level and is therefore providing a tool for improving the plant-wide performance. The performance function has been used in dierent setups to improve the performance of the refrigeration system. Static and the dynamic performance of the refrigeration system has been addressed in the project. The proposed methods for improvement relies on a minimum of detailed knowledge about the refrigeration system. In addition, since a refrigeration system often operates in steady state an active system monitoring setup has been proposed, to enable improvement of the dynamic performance.
Original language | English |
---|
Place of Publication | Kgs. Lyngby |
---|---|
Publisher | Technical University of Denmark, Department of Electrical Engineering |
Number of pages | 174 |
ISBN (Print) | 978-87-92465-75-7 |
Publication status | Published - 2012 |
Fingerprint
Dive into the research topics of 'Performance Assessment and Active System Monitoring for Refrigeration Systems'. Together they form a unique fingerprint.Projects
- 1 Finished
-
Active performance assessment and system monitoring for refrigeration systems
Green, T. (PhD Student), Niemann, H. H. (Main Supervisor), Izadi-Zamanabadi, R. (Supervisor), Skovrup, M. J. (Supervisor), Ravn, O. (Examiner), Stetter, R. (Examiner) & Hägglund, T. (Examiner)
01/12/2008 → 27/09/2012
Project: PhD