Operational costs induced by fluctuating wind power production in Germany and Scandinavia

Peter Meibom, C. Weber, R. Barth, H. Brand

    Research output: Contribution to journalJournal articleResearchpeer-review

    Abstract

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward and will therefore influence the operational costs induced by wind power production. A method is applied for calculating the change in operational costs due to wind power production using a stochastic optimisation model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs, namely perfectly predictable wind power production enabling the calculation of the costs connected to partial predictability and constant wind power production enabling the calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed.
    Original languageEnglish
    JournalI E T Renewable Power Generation
    Volume3
    Issue number1
    Pages (from-to)75-83
    ISSN1752-1416
    DOIs
    Publication statusPublished - 2009

    Cite this

    Meibom, Peter ; Weber, C. ; Barth, R. ; Brand, H. / Operational costs induced by fluctuating wind power production in Germany and Scandinavia. In: I E T Renewable Power Generation. 2009 ; Vol. 3, No. 1. pp. 75-83.
    @article{714f83816fdc4e5e843171e18515a6be,
    title = "Operational costs induced by fluctuating wind power production in Germany and Scandinavia",
    abstract = "Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward and will therefore influence the operational costs induced by wind power production. A method is applied for calculating the change in operational costs due to wind power production using a stochastic optimisation model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs, namely perfectly predictable wind power production enabling the calculation of the costs connected to partial predictability and constant wind power production enabling the calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed.",
    keywords = "Samfund og systemer",
    author = "Peter Meibom and C. Weber and R. Barth and H. Brand",
    year = "2009",
    doi = "10.1049/iet-rpg:20070075",
    language = "English",
    volume = "3",
    pages = "75--83",
    journal = "I E T Renewable Power Generation",
    issn = "1752-1416",
    publisher = "The/Institution of Engineering and Technology",
    number = "1",

    }

    Operational costs induced by fluctuating wind power production in Germany and Scandinavia. / Meibom, Peter; Weber, C.; Barth, R.; Brand, H.

    In: I E T Renewable Power Generation, Vol. 3, No. 1, 2009, p. 75-83.

    Research output: Contribution to journalJournal articleResearchpeer-review

    TY - JOUR

    T1 - Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    AU - Meibom, Peter

    AU - Weber, C.

    AU - Barth, R.

    AU - Brand, H.

    PY - 2009

    Y1 - 2009

    N2 - Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward and will therefore influence the operational costs induced by wind power production. A method is applied for calculating the change in operational costs due to wind power production using a stochastic optimisation model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs, namely perfectly predictable wind power production enabling the calculation of the costs connected to partial predictability and constant wind power production enabling the calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed.

    AB - Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward and will therefore influence the operational costs induced by wind power production. A method is applied for calculating the change in operational costs due to wind power production using a stochastic optimisation model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs, namely perfectly predictable wind power production enabling the calculation of the costs connected to partial predictability and constant wind power production enabling the calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed.

    KW - Samfund og systemer

    U2 - 10.1049/iet-rpg:20070075

    DO - 10.1049/iet-rpg:20070075

    M3 - Journal article

    VL - 3

    SP - 75

    EP - 83

    JO - I E T Renewable Power Generation

    JF - I E T Renewable Power Generation

    SN - 1752-1416

    IS - 1

    ER -