Off-Site Prefabrication: What Does it Require from the Trade Contractor?

Baris Bekdik, Daniel Hall , Sigmund Aslesen

    Research output: Chapter in Book/Report/Conference proceedingArticle in proceedingsResearchpeer-review

    666 Downloads (Pure)

    Abstract

    The purpose of the paper is to show what is required to industrialize a building process from the standpoint of the trade contractor. Rationalization of building processes has, over the years, caught the attention of numerous IGLC papers. Although significant contributions have been made to further understand and improve existing construction processes, relatively few contributions have focused on the opportunities for industrialization from the trade contractor’s perspective. This paper uses an in-depth case study to address the deployment strategy for off-site fabrication techniques and processes used for modular plumbing fixture carriers deployed on two large-scale hospital projects in the United States. Findings include the organizational and technological arrangement for prefabrication. The paper applies value stream mapping to visualize the process and improve it. Because this work looks at only one case study, the conclusions are limited in generalizability to other prefabrication operations. However, it represents an important in-depth case from the trade contractors’ perspective and will contribute to the growing body of research focused on industrialization and prefabrication in lean construction. .
    Original languageEnglish
    Title of host publicationProceedings of 24th Annual Conference of the International Group for Lean Construction (IGLC 2016)
    PublisherIGLC
    Publication date2016
    Pages43-52
    Publication statusPublished - 2016
    Event24th Annual Conference of the International Group for Lean Construction - Boston, United States
    Duration: 19 Jul 201619 Jul 2016
    Conference number: 24

    Conference

    Conference24th Annual Conference of the International Group for Lean Construction
    Number24
    Country/TerritoryUnited States
    CityBoston
    Period19/07/201619/07/2016

    Keywords

    • Lean construction
    • Modularity
    • Prefabrication
    • Standardization
    • value stream mapping (VSM)

    Fingerprint

    Dive into the research topics of 'Off-Site Prefabrication: What Does it Require from the Trade Contractor?'. Together they form a unique fingerprint.

    Cite this