Numerical calculation of economic uncertainty by intervals and fuzzy numbers

Hans Schjær-Jacobsen

Research output: Contribution to journalJournal articleResearchpeer-review

255 Downloads (Pure)

Abstract

This paper emphasizes that numerically correct calculation of economic uncertainty with intervals and fuzzy numbers requires implementation of global optimization techniques in contrast to straightforward application of interval arithmetic. This is demonstrated by both a simple case from managerial economics as well as a real life railway reconstruction project. Based on identical uncertain input data the difference between the probabilistic and the possibilitistic approach is highlighted, the latter producing a substantial larger degree of numerical uncertainty due to its non-statistical nature.
2010 World Academic Press, UK. All rights reserved.
Original languageEnglish
JournalJournal of Uncertain Systems
Volume4
Issue number1
Pages (from-to)47-58
ISSN1752-8909
Publication statusPublished - 2010

Bibliographical note

© 2010 WAP

Keywords

  • Economic uncertaqinty
  • Intervals
  • Fuzzy numbers
  • Probability
  • Possibility

Projects

Risk and uncertainty management in economy and engineering

Schjær-Jacobsen, H.

01/01/2006 → …

Project: Research

Cite this