Projects per year
Original language | English |
---|---|
Title of host publication | Proceedings of the 17th Wind Integration Workshop |
Number of pages | 6 |
Publisher | Energynautics GmbH |
Publication date | 2018 |
Publication status | Published - 2018 |
Event | 17th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants - KTH Royal Institute of Technology, Stockholm, Sweden Duration: 17 Oct 2018 → 19 Oct 2018 http://windintegrationworkshop.org/ |
Conference
Conference | 17th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants |
---|---|
Location | KTH Royal Institute of Technology |
Country/Territory | Sweden |
City | Stockholm |
Period | 17/10/2018 → 19/10/2018 |
Internet address |
Bibliographical note
This paper (presentation files/pictures/video/audio) was presented at the 17th Wind Integration Workshop and published in the workshop’s proceedings.Projects
- 2 Finished
-
Modelling and optimization of the North Sea region's energy system in the long term
Gea-Bermudez, J. (PhD Student), Kitzing, L. (Main Supervisor), Brown, T. (Examiner), Heinrichs, H. U. (Examiner), Keles, D. (Examiner), Kitzing, L. (Main Supervisor), Koivisto, M. J. (Supervisor) & Pade, L.-L. (Supervisor)
01/07/2018 → 02/12/2021
Project: PhD
-
NSON-DK: North Sea Offshore Network - Denmark
Sørensen, P. E. S. (Project Coordinator), Das, K. (Project Participant), Koivisto, M. J. (Project Participant), Pade, L.-L. (Project Participant), Skytte, K. (Project Participant), Gea-Bermudez, J. (Project Participant), Papakonstantinou, A. (Project Participant), Boscán Flores, L. R. (Project Participant), Kanellas, P. (Project Participant), Plakas, K. (Project Participant), Kitzing, L. (Project Participant) & Bergaentzlé, C. M. (Project Participant)
01/04/2016 → 31/03/2020
Project: Research