TY - RPRT
T1 - Investigation on Kombiterm GE Domestic Hot Water Tank.
T2 - Performance Measurements and Calculations.
AU - Heller, Alfred
AU - Heuer, Andreas Walter
PY - 1996
Y1 - 1996
N2 - Investigation of a hot water tank with a high heat exchanger
spiral with a small pipe diameter in the upper part of the heat
exchanger spiral and a large pipe diameter in the lower part of
the heat exchanger spiral in cooperation with Kãhler&Breum
Beholder- og Maskinfabrik K/S. First preprint of project resulting
in final "Sagsrapport": Andreas Heuer, "High Spiral Heat Exchanger
in Domestic Hot Water Tanks.", SR-9711, 1997, ISSN
1396-402X.Andreas Heuer, "User Manual for Simulation Program
GETANK", SR-9712, 1997, ISSN1396-402X.
AB - Investigation of a hot water tank with a high heat exchanger
spiral with a small pipe diameter in the upper part of the heat
exchanger spiral and a large pipe diameter in the lower part of
the heat exchanger spiral in cooperation with Kãhler&Breum
Beholder- og Maskinfabrik K/S. First preprint of project resulting
in final "Sagsrapport": Andreas Heuer, "High Spiral Heat Exchanger
in Domestic Hot Water Tanks.", SR-9711, 1997, ISSN
1396-402X.Andreas Heuer, "User Manual for Simulation Program
GETANK", SR-9712, 1997, ISSN1396-402X.
M3 - Rapport
BT - Investigation on Kombiterm GE Domestic Hot Water Tank.
ER -