Abstract
The development of strategies for sequencing slabs through the reheat furnace and rolling mill of a modern steel production facility is complicated by multiple, and often conflicting production objectives. Optimal energy efficiency through the reheat furnace may lead to inefficient rolling sequences or less than desirable product delivery schedules. Not only is model formulation complicated, but the combinatorial nature of the problem precludes optimal solution. A heuristic procedure for solving this multi-objective product sequencing problem has been developed and tested under production conditions in a Danish steel mill. The methodology, which is based on a modified ‘greedy’ algorithm is presented and results using actual production data are discussed
Original language | English |
---|---|
Journal | International Journal of Production Research |
Volume | 30 |
Issue number | 6 |
Pages (from-to) | 1415-1425 |
ISSN | 0020-7543 |
DOIs | |
Publication status | Published - 1992 |
Keywords
- planning
- optimization
- simulation