Improved Method for Calculating Power-Transfer Capability Curves of Offshore Wind Farms Cables

    Research output: Chapter in Book/Report/Conference proceedingArticle in proceedingsResearchpeer-review

    326 Downloads (Pure)

    Abstract

    The power-transfer capability curve is widely used by Offshore Wind Farms (OWFs) planner when designing their grid connection. An improved method for calculating power-transfer capability curves of OWFs cables is presented in this paper. What differentiates this method compared to the traditional approach, is the consideration of the high power variability and low capacity factors of OWFs, instead of assuming continuous nominal conditions. The method is based on an iterative approach, aiming to determine the maximum total installed power of an OWF, that a cable can support in function of its total length (effective length from the Offshore Substation, OSS, to the Onshore Connection Point, OCP); in order to do so, operational constraints such as: voltage swing limit, Surge Impedance Limit (SIL), and thermal limit are taken into account. By means of this strategy, is possible to estimate more accurately and realistically the power limits and binding constraints, hence exploiting the cables’ capacities under particular installation and operating conditions. The translation from rated conditions towards dynamic behaviours, permits the inclusion of more realistic states of the system, for instance, accounting not only for the wind speeds fluctuations, but also the variation of boundary temperatures (seabed), and other thermal parameters which have strong influence over buried cables’ thermal performance. The transmission cables are modelled considering a uniform distribution of their electrical parameters, inductance and capacitance, by means of the attenuation constant and characteristic impedance. Likewise, A Thermo-Electrical Equivalent Model (TEE) is applied for the thermal analysis given its good solution quality-computation time balance. The proposed methodology is applied to a 800 mm2 cable, with the results showing an estimated increase of OWF total installed power of 110% for a total length of 120 km, when compared to the traditional method.
    Original languageEnglish
    Title of host publicationProceedings of the Cigre Aalborg 2019: International Symposium
    Number of pages10
    Publication date2019
    Chapter012
    Publication statusPublished - 2019
    EventCigre Aalborg 2019: International Symposium - Aalborg Congress and Culture Centre, Aalborg, Denmark
    Duration: 4 Jun 20197 Jun 2019
    https://cigreaalborg2019.dk/

    Conference

    ConferenceCigre Aalborg 2019: International Symposium
    LocationAalborg Congress and Culture Centre
    Country/TerritoryDenmark
    CityAalborg
    Period04/06/201907/06/2019
    Internet address

    Fingerprint

    Dive into the research topics of 'Improved Method for Calculating Power-Transfer Capability Curves of Offshore Wind Farms Cables'. Together they form a unique fingerprint.

    Cite this