Evacuation tests with elevated platforms in railway tunnels

Eva-Sara Carlson*, Mia Kumm, Artur Zakirov, Anne Simone Dederichs

*Corresponding author for this work

    Research output: Contribution to journalJournal articleResearchpeer-review

    Abstract

    With the purpose to increase the knowledge on human behaviour when evacuating along elevated platforms, an experiment was carried out at the subway station of Skarpnäck, Stockholm, in October 2016. The overall project objective was to develop basic data for guidelines regarding fire safety design concerning evacuation along elevated platforms. The experiment was designed as a group experiment divided into five different scenarios. In total, 111 persons of mixed gender and age participated. The results from the experiment show that the flow rate along the elevated platform decreased as the walkway was getting narrower. It could also be seen that along the first half of the walkway, where a train was located on the rail track next to the elevated platform, the flow rate was higher and the width of the walkway was used to a lager extent compared to the second half of the walkway where the platform was open to the track area. One of three wheelchair users who participated in the experiment expressed discomfort caused by the height and the width of the walkway and nearly half of the participants experienced problems with passing others walking slower than themselves.
    Original languageEnglish
    Article number102840
    JournalFire Safety Journal
    Volume108
    Number of pages10
    ISSN0379-7112
    DOIs
    Publication statusPublished - 2019

    Fingerprint

    Dive into the research topics of 'Evacuation tests with elevated platforms in railway tunnels'. Together they form a unique fingerprint.

    Cite this