Energy yield prediction of offshore wind farm clusters at the EERA-DTOC European project

E. Cantero, J. Sanz, S. Lorenzo, Charlotte Bay Hasager, G. Sieros, P. Stuart, T. Young, A. Palomares, J. Navarro, M. Waechter, A. Morales

    Research output: Contribution to conferencePosterResearchpeer-review

    346 Downloads (Pure)

    Abstract

    A new integrated design tool for optimization of offshore wind farm clusters is under development in the European Energy Research Alliance – Design Tools for Offshore wind farm Cluster project (EERA DTOC). The project builds on already established design tools from the project partners and possibly third-party models. Wake models have been benchmarked on the Horns Rev and, currently, on the Lilgrund wind farm test cases. Dedicated experiments from ‘BARD Offshore 1’ wind farm will using scanning lidars will produce new data for the validation of wake models. Furthermore, the project includes power plant interconnection and energy yield models all interrelated with a simplified cost model for the evaluation of layout scenarios. The overall aim is to produce an efficient, easy to use and flexible tool - to facilitate the optimised design of individual and clusters of offshore wind farms. A demonstration phase at the end of the project will assess the value of the integrated design tool with the help of potential end-users from industry.
    This abstracts summarizes the objectives and preliminary results of work package 3. In order to provide an accurate value of the expected net energy yield, the offshore wind resource assessment process has been reviewed as well as the sources of uncertainty associated to each step.
    Methodologies for the assessment of offshore gross annual energy production are analyzed based on the Fino 1 test case. Measured data and virtual data from Numerical Weather Prediction models have been used to calculate long term wind speed, wind profile and gross energy.

    Original languageEnglish
    Publication date2013
    Number of pages1
    Publication statusPublished - 2013
    EventEWEA Offshore 2013 - Frankfurt, Germany
    Duration: 19 Nov 201321 Nov 2013
    http://www.ewea.org/offshore2013/

    Conference

    ConferenceEWEA Offshore 2013
    Country/TerritoryGermany
    CityFrankfurt
    Period19/11/201321/11/2013
    Internet address

    Fingerprint

    Dive into the research topics of 'Energy yield prediction of offshore wind farm clusters at the EERA-DTOC European project'. Together they form a unique fingerprint.

    Cite this