    Abstract

    The energy and material necessary to construct a power plant and the land covered by the plant are indicators for the ‘consumption’ of environment by a certain technology. Based on current knowledge, estimations show that the material necessary to construct a fusion plant will exceed the material requirement of a fission plant by a factor of two. The material requirement for a fusion plant is roughly 2000 t/MW and little less than 1000 t/MW for a fission plant. The land requirement for a fusion plant is roughly 300 m2/MW and the land requirement for a fission plant is a little less than 200 m2/MW. The energy pay back time, defined later in Section 6, is little more than half a year for a fusion plant with capacity 1 GWe. Only the electrical energy is accounted for as released energy not the thermal energy. In all these indicators, fusion compares well with conventional technologies while it consumes less ‘environment’ for the construction than renewable technologies, especially wind and solar.
    Original languageEnglish
    JournalFusion Engineering and Design
    Volume58-59
    Pages (from-to)1081-1085
    ISSN0920-3796
    DOIs
    Publication statusPublished - Nov 2001

    Keywords

    • Energy
    • Land
    • Consumption

    Fingerprint Dive into the research topics of 'Energy, material and land requirement of a fusion plant'. Together they form a unique fingerprint.

    Cite this