EMT model validation of an offshore wind power plant with SGRE DD wind turbines under real power system events

G. M. Gomes Guerreiro*, R. Sharma, F. Martin, G. Yang

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingArticle in proceedingsResearchpeer-review

Abstract

Electromagnetic Transient (EMT) models are essential to wind power plant developers and transmission system operators alike. Therefore, during the development of any newWind Turbines (WTs), EMT models are also developed. These models are qualityassured by validating against measurements from a prototype turbine, specifically for fault ride-through (FRT) cases. One way of performing model validation is through the voltage play-back method described in IEC 61400-21-2, where a voltage-dependent source reproduces the voltage measurements from the site (at the MV terminals of the WT transformer) and the current/power injections from the WT are compared against the measurements (at the LV terminals of the WT transformer). WPPs are designed and developed with the help of these models. However, a WPP electrical system can be complex with wind turbines, passive components, cables, and active components such as filters, Static VAr Compensators, and/or HVDCs. So it is interesting and sometimes essential to ensure that the assessment studies performed during the development of WPP are accurate. Furthermore, passive equipment in the WPP may change important characteristics either due to internal failures or aging, wind turbine control software version, and parameters may be updated, etc. It is often valuable to ensure that models are still capable of representing the actual behaviors seen on the field so that grid compliance and stability can be studied throughout the operation. In this context, this paper presents the EMT model validation of an offshore WPP with Siemens Gamesa Renewable Energy's (SGRE) direct-drive (DD) Type IV Wind Turbines using the voltage play-back method under real power system events. The faults were unbalanced and happened at the nearby grid, leading all the turbines of the plant into FRT mode. The model used was developed during the design of the WPP and the evaluation is done at both the plant and turbine levels. It is shown that the EMT models of operational WPPs were able to reproduce the real measurements with high accuracy. The paper also discusses the different challenges concerning measurement location placement, data acquisition, aggregation methods, preprocessing, turbine connection status, and production at the time of the fault.
Original languageEnglish
Title of host publicationProceedings of 22nd Wind and Solar Integration Workshop (WIW 2023)
Number of pages6
PublisherInstitution of Engineering and Technology
Publication date2023
Pages44-49
ISBN (Electronic)978-1-83953-966-4
DOIs
Publication statusPublished - 2023
Event22nd Wind and Solar Integration Workshop
- DTU, Lyngby, Denmark
Duration: 26 Sept 202328 Sept 2023
https://windintegrationworkshop.org/copenhagen2023/

Conference

Conference22nd Wind and Solar Integration Workshop
LocationDTU
Country/TerritoryDenmark
CityLyngby
Period26/09/202328/09/2023
Internet address

Keywords

  • Offshore wind
  • Wind power plant
  • EMT model validation
  • Grid compliance
  • Power systems' events

Fingerprint

Dive into the research topics of 'EMT model validation of an offshore wind power plant with SGRE DD wind turbines under real power system events'. Together they form a unique fingerprint.

Cite this