Abstract
The electromagnetic compatibility (EMC) and interference (EMI) challenges during the development, construction,
testing and installation of a measurement system for multi-point, high-speed and long-term data logging is described
in this paper. The presented measurement system was tested in a rough offshore environment at Avedøre Holme and
Gunfleet Sands offshore wind farms. The paper clearly presents possible electromagnetic interference in wind
turbines that can affect measurements. Also the application of appropriate mitigation techniques such as data
acquisition board configuration, coaxial cable leading, as well as usage of EMC-proof boxes for high frequency
measurements is described. Some measurement results focused on dealing with EMI are also presented and
explained.
Original language | English |
---|---|
Journal | Energy Procedia |
ISSN | 1876-6102 |
Publication status | Published - 2012 |
Event | 9th Deep Sea Offshore Wind R&D Seminar - Trondheim, Norway Duration: 19 Jan 2012 → 20 Jan 2012 Conference number: 9 http://www.sintef.no/Projectweb/Deepwind_2012/ |
Conference
Conference | 9th Deep Sea Offshore Wind R&D Seminar |
---|---|
Number | 9 |
Country/Territory | Norway |
City | Trondheim |
Period | 19/01/2012 → 20/01/2012 |
Internet address |
Keywords
- Transient measurements
- EMI
- EMC
- Offshore wind farm
- Harmonic measurements