Drying of Concrete

Kurt Kielsgaard Hansen, Mette Rica Geiker, Peter Vagn Nygaard, Ane Mette Kjeldsen

Research output: Chapter in Book/Report/Conference proceedingArticle in proceedingsResearch

Abstract

Estimated and measured relative humidity (RH) change during drying are compared for two concretes, 1: w/c=0.46 and 2: w/(c+0.5fa+2sf)=0.50. The estimations were undertaken by means of the Swedish program TorkaS 1.0. Measurements were performed by RH-sensors type Humi-Guard. Drying of 150 mm thick samples from sides at 60% RH and 22 °C took place from 4 to 56 days after casting. At the end of the drying period the measured RH was about 4% lower than the estimated RH at 1/5th depth from the exposed surface for both concretes. In the middle of the samples, the measured RH of concretes 1 and 2 were 2% lower and 2% higher, respectively, than estimated values.
Original languageEnglish
Title of host publicationProceedings of Nordic Concrete Research Meeting
PublisherHelli Grafisk AS, Oslo
Publication date2002
Pages283-285
ISBN (Print)82-91341-56-7
Publication statusPublished - 2002
EventXVIII Symposium on Nordic Concrete Research - Helsingør, Denmark
Duration: 12 Jun 200214 Jun 2002
Conference number: 18

Conference

ConferenceXVIII Symposium on Nordic Concrete Research
Number18
Country/TerritoryDenmark
CityHelsingør
Period12/06/200214/06/2002

Fingerprint

Dive into the research topics of 'Drying of Concrete'. Together they form a unique fingerprint.

Cite this