Abstract
The development process of a flexible measurement system for multi-point, high-speed and long-term offshore data logging is described in this paper. This covers the complete design taking into account precise synchronisation, electromagnetic compatibility, software development and sensor calibration. The presented measurement set-up was tested in a rough offshore environment. Results from measurement campaigns at Avedøre and Gunfleet Sands offshore wind farms including synchronisation precision and accuracy, electromagnetic interference of power electronic devices are briefly presented.
Original language | English |
---|---|
Publication date | 2011 |
Publication status | Published - 2011 |
Event | 10th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Farms - Aarhus, Denmark Duration: 25 Oct 2011 → 26 Oct 2011 http://www.windintegrationworkshop.org/aarhus2011/index.html |
Workshop
Workshop | 10th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Farms |
---|---|
Country/Territory | Denmark |
City | Aarhus |
Period | 25/10/2011 → 26/10/2011 |
Internet address |
Keywords
- Measurement software
- High-speed logging
- Transient measurements
- Long-term logging
- GPS Synchronisation
- Offshore wind farm
- Harmonic measurements