Abstract
A description is given of a BWR power plant model outlined for the Barsebåck 2 plant with data placed at our disposal by the Swedish Power Company Sydkraft A/B.
The basic equations are derived and simplifications discussed.
The model is implemented with a simulation system DYSYS which assures reliable solutions and easy programming. Emphasis has been placed on the models versatility and flexibility so new features are easy to incorporate. The model may be used for transient calculations for both normal plant conditions and for abnormal occurrences as well as for control system studies.
The basic equations are derived and simplifications discussed.
The model is implemented with a simulation system DYSYS which assures reliable solutions and easy programming. Emphasis has been placed on the models versatility and flexibility so new features are easy to incorporate. The model may be used for transient calculations for both normal plant conditions and for abnormal occurrences as well as for control system studies.
Original language | English |
---|
Place of Publication | Roskilde, Denmark |
---|---|
Publisher | Risø National Laboratory |
Number of pages | 61 |
Publication status | Published - 1979 |
Series | Risø-M |
---|---|
Number | 2190 |
ISSN | 0418-6435 |
Keywords
- Risø-M-2190