Projects per year
Abstract
Deliverable 8.1 reports results on analytics and visualizations of real time flexibility in support of voltage and frequency control in 2030+ power system. The investigation is carried out by means of relevant control room scenarios in order to derive the appropriate analytics needed for each specific network events
| Original language | English |
|---|
| Number of pages | 83 |
|---|---|
| Publication status | Published - 2017 |
Bibliographical note
EU FP7 project ELECTRA - Public deliverable. <br/>M. Marinelli, et al., “Demonstration of visualization techniques for the control room engineer in 2030,” ELECTRA Deliverable D8.1. WP8: Future Control Room Functionality. Mar. 2017Fingerprint
Dive into the research topics of 'Demonstration of visualization techniques for the control room engineer in 2030. ELECTRA Deliverable D8.1. WP8: Future Control Room Functionality'. Together they form a unique fingerprint.Projects
- 1 Finished
-
ELECTRA Top-Up
Marinelli, M. (PI), Bindner, H. W. (Project Participant), Pertl, M. G. (PhD Student) & Rezkalla, M. M. N. (PhD Student)
Energiteknologisk Udviklings- og Demonstrationsprogram
01/11/2014 → 31/10/2017
Project: Research
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver