Abstract
This paper presents a critical path driven algorithm to produce a static schedule of a single-rate system onto a heterogeneous target architecture. Our algorithm is a list based scheduling algorithm which concurrently assigns tasks to processors and allocates nets to interprocessor communication. Experimental results show that our algorithm is able to find good results, as compared to other methods, in small amount of CPU time.
| Original language | English |
|---|---|
| Title of host publication | International Workshop on Hardware/Software Codesign |
| Publisher | IEEE |
| Publication date | 1997 |
| Pages | 15-19 |
| ISBN (Print) | 0-8186-7895-X |
| DOIs | |
| Publication status | Published - 1997 |
| Event | 7th IEEE/ACM International Conference on Hardware/Software Codesign and System Synthesis - Grenoble, France Duration: 11 Oct 2009 → 16 Oct 2009 Conference number: 7 |
Conference
| Conference | 7th IEEE/ACM International Conference on Hardware/Software Codesign and System Synthesis |
|---|---|
| Number | 7 |
| Country/Territory | France |
| City | Grenoble |
| Period | 11/10/2009 → 16/10/2009 |
Bibliographical note
Copyright: 1997 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEEFingerprint
Dive into the research topics of 'Critical Path Driven Cosynthesis for Heterogeneous Target Architectures'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver