Critical Path Driven Cosynthesis for Heterogeneous Target Architectures

Peter Bjørn-Jørgensen, Jan Madsen

    Research output: Chapter in Book/Report/Conference proceedingArticle in proceedingsResearchpeer-review

    467 Downloads (Pure)

    Abstract

    This paper presents a critical path driven algorithm to produce a static schedule of a single-rate system onto a heterogeneous target architecture. Our algorithm is a list based scheduling algorithm which concurrently assigns tasks to processors and allocates nets to interprocessor communication. Experimental results show that our algorithm is able to find good results, as compared to other methods, in small amount of CPU time.
    Original languageEnglish
    Title of host publicationInternational Workshop on Hardware/Software Codesign
    PublisherIEEE
    Publication date1997
    Pages15-19
    ISBN (Print)0-8186-7895-X
    DOIs
    Publication statusPublished - 1997
    Event7th IEEE/ACM International Conference on Hardware/Software Codesign and System Synthesis - Grenoble, France
    Duration: 11 Oct 200916 Oct 2009
    Conference number: 7

    Conference

    Conference7th IEEE/ACM International Conference on Hardware/Software Codesign and System Synthesis
    Number7
    Country/TerritoryFrance
    CityGrenoble
    Period11/10/200916/10/2009

    Bibliographical note

    Copyright: 1997 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE

    Fingerprint

    Dive into the research topics of 'Critical Path Driven Cosynthesis for Heterogeneous Target Architectures'. Together they form a unique fingerprint.

    Cite this