Cost curve construction: Case examples

R.Y. Redlinger

    Research output: Contribution to conferenceConference abstract for conferenceResearch

    Original languageEnglish
    Publication date1997
    Publication statusPublished - 1997
    EventUNEP/GEF workshop on economics of greenhouse gas limitation - Le Barjaya, Malaysia
    Duration: 22 May 199728 May 1997

    Workshop

    WorkshopUNEP/GEF workshop on economics of greenhouse gas limitation
    CountryMalaysia
    CityLe Barjaya
    Period22/05/199728/05/1997

    Cite this

    Redlinger, R. Y. (1997). Cost curve construction: Case examples. Abstract from UNEP/GEF workshop on economics of greenhouse gas limitation, Le Barjaya, Malaysia.
    Redlinger, R.Y. / Cost curve construction: Case examples. Abstract from UNEP/GEF workshop on economics of greenhouse gas limitation, Le Barjaya, Malaysia.
    @conference{8f46ae7b4af7456ea2e4d2f086c8a74a,
    title = "Cost curve construction: Case examples",
    keywords = "Systemanalyse",
    author = "R.Y. Redlinger",
    year = "1997",
    language = "English",
    note = "UNEP/GEF workshop on economics of greenhouse gas limitation ; Conference date: 22-05-1997 Through 28-05-1997",

    }

    Redlinger, RY 1997, 'Cost curve construction: Case examples' UNEP/GEF workshop on economics of greenhouse gas limitation, Le Barjaya, Malaysia, 22/05/1997 - 28/05/1997, .

    Cost curve construction: Case examples. / Redlinger, R.Y.

    1997. Abstract from UNEP/GEF workshop on economics of greenhouse gas limitation, Le Barjaya, Malaysia.

    Research output: Contribution to conferenceConference abstract for conferenceResearch

    TY - ABST

    T1 - Cost curve construction: Case examples

    AU - Redlinger, R.Y.

    PY - 1997

    Y1 - 1997

    KW - Systemanalyse

    M3 - Conference abstract for conference

    ER -

    Redlinger RY. Cost curve construction: Case examples. 1997. Abstract from UNEP/GEF workshop on economics of greenhouse gas limitation, Le Barjaya, Malaysia.