TY - GEN
T1 - Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade
AU - Bongers, W. A.
AU - Kasparek, W.
AU - Doelman, N.
AU - van den Braber, R.
AU - van den Brand, H.
AU - Meo, Fernando
AU - de Baar, M. R.
AU - Amerongen, F. J.
AU - Donne, A. J. H.
AU - Elzendoorn, B. S. Q.
AU - Erckmann, V.
AU - Goede, A. P. H.
AU - Giannone, L.
AU - Grünwald, G.
AU - Hollman, F.
AU - Kaas, G.
AU - Krijger, B.
AU - Michel, G.
AU - Lubyako, L.
AU - Monaco, F.
AU - Noke, F.
AU - Petelin, M.
AU - Plaum, B.
AU - Purps, F.
AU - ten Pierik, J. G. W.
AU - Schüller, C.
AU - Slob, J. W.
AU - Stober, J. K.
AU - Schütz, H.
AU - Wagner, D.
AU - Westerhof, E.
AU - Ronden, D. M. S.
N1 - This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0 , which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
PY - 2012
Y1 - 2012
N2 - A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.
AB - A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.
U2 - 10.1051/epjconf/20123203006
DO - 10.1051/epjconf/20123203006
M3 - Conference article
SN - 2100-014X
VL - 32
SP - 03006
JO - E P J Web of Conferences
JF - E P J Web of Conferences
T2 - 17th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating
Y2 - 7 May 2012 through 10 May 2012
ER -