Abstract
Concrete repairs on 11 pillars on bridges built in the sixties and
repaired 8 to 9 years ago have been examined. Especially the
chloride penetration in the repair concrete have been measured.
Chloride penetration in the repair concrete is much lower than in
the original concrete.
Original language | Danish |
---|
Number of pages | 40 |
---|---|
ISBN (Print) | 87-9723-005-9 |
Publication status | Published - 1999 |
Bibliographical note
The report is a development of the master thesis of Eydbjørn Brimnes and Bogi í Dali. The report is in Danish with English summary (4 pages).40 pages + 5 appendices