Assumptions on accuracy of wind power to be considered at short and long term horizons: OPTIMATE project deliverable D3.1

    Research output: Book/ReportReportResearch

    173 Downloads (Orbit)
    Original languageEnglish
    PublisherThe OPTIMATE project
    Number of pages31
    Publication statusPublished - 2010

    Keywords

    • Energy systems analysis
    • Systems analysis

    Cite this