TY - RPRT
T1 - Aircraft Stand Allocation with Associated Resource Scheduling
AU - Justesen, Tor Fog
AU - Larsen, Jesper
AU - Lusby, Richard Martin
AU - Ryan, David M.
AU - Dohn, Anders H.
PY - 2015
Y1 - 2015
N2 - An aircraft turn-round refers to the set of processes taking place from when an aircraft
parks at its arrival stand until the time it departs from its departure stand. When
handling a turn-round, the different processes involved (arrival, disembarkation of passengers,
cleaning, etc.) require different ground handling resources (taxiways, aircraft stands,
gates, etc) at different times. Each resource can be claimed by at most one turn-round
at a time. The aircraft stand allocation problem with associated resource scheduling is
the problem of allocating the required ground handling resources to handle a given set of
aircraft turn-rounds. We develop a set packing-based model formulation of the problem
which is both flexible in the sense that it can encapsulate any type of resource required
during the handling of a turn-round and strong in the sense that conflicts that occur when
two or more turn-rounds simultaneously claim the same resource are handled implicitly.
To solve the model, a heuristic based on linear programming is developed. The heuristic
iteratively solves a relaxed, restricted version of the problem, adding extra variables at
each iteration if needed. The additional variables are identified by a cost-based partial
enumeration of the possible variables for each turn-round and the heuristic stops when
the first feasible solution is encountered. The heuristic has been tested on real data from
Copenhagen Airport with a special focus on tactical day-to-day planning. The results
show that the method generates high-quality feasible solutions within reasonable time for
tactical planning.
AB - An aircraft turn-round refers to the set of processes taking place from when an aircraft
parks at its arrival stand until the time it departs from its departure stand. When
handling a turn-round, the different processes involved (arrival, disembarkation of passengers,
cleaning, etc.) require different ground handling resources (taxiways, aircraft stands,
gates, etc) at different times. Each resource can be claimed by at most one turn-round
at a time. The aircraft stand allocation problem with associated resource scheduling is
the problem of allocating the required ground handling resources to handle a given set of
aircraft turn-rounds. We develop a set packing-based model formulation of the problem
which is both flexible in the sense that it can encapsulate any type of resource required
during the handling of a turn-round and strong in the sense that conflicts that occur when
two or more turn-rounds simultaneously claim the same resource are handled implicitly.
To solve the model, a heuristic based on linear programming is developed. The heuristic
iteratively solves a relaxed, restricted version of the problem, adding extra variables at
each iteration if needed. The additional variables are identified by a cost-based partial
enumeration of the possible variables for each turn-round and the heuristic stops when
the first feasible solution is encountered. The heuristic has been tested on real data from
Copenhagen Airport with a special focus on tactical day-to-day planning. The results
show that the method generates high-quality feasible solutions within reasonable time for
tactical planning.
M3 - Report
BT - Aircraft Stand Allocation with Associated Resource Scheduling
PB - DTU Management Engineering
ER -