TY - RPRT
T1 - Advanced Stellar Compass - Proposal for the SMART-1 Project
AU - Jørgensen, John Leif
AU - Betto, Maurizio
AU - Kilsgaard, Søren
AU - Madsen, Peter Buch
AU - Riis, Troels
AU - Thuesen, Gøsta
AU - Jacobsen, Peter
PY - 1998
Y1 - 1998
N2 - This proposal is the DTU response to the Swedish Space Corporation
(SSC) request for proposal (r.f.p.) for the SMART-1 star
tracker.SMART-1 is a small ESA scientific and technological
satellite planned to be launched in late 2001.The Advanced Stellar
Compass (ASC) is a highly advanced and autonomous Stellar
Reference Unit designed, developed and produced by the Space
Instrumentation Group of the Department of Automation of the
Technical University of Denmark.The document is structured as
follows. First we present the ASC - heritage, system description,
performance - then we address more specifically the environmental
properties, like the EMC compatibility and thermal
characteristics, and the design and reliability issues. Section 6
deals with the testing and the calibration procedures and in
section 7 the mechanical and electrical interfaces are given. In
section 8 and 9 we address issues like manufacturing,
transportation and storage, in section 10 the requirements imposed
by the ASC on the system are given and to conclude we address the
financial issues (sect. 11) and we review the ASC specifications
against the SMART-1 requirements and provide the compliance
matrices (sect. 12).
AB - This proposal is the DTU response to the Swedish Space Corporation
(SSC) request for proposal (r.f.p.) for the SMART-1 star
tracker.SMART-1 is a small ESA scientific and technological
satellite planned to be launched in late 2001.The Advanced Stellar
Compass (ASC) is a highly advanced and autonomous Stellar
Reference Unit designed, developed and produced by the Space
Instrumentation Group of the Department of Automation of the
Technical University of Denmark.The document is structured as
follows. First we present the ASC - heritage, system description,
performance - then we address more specifically the environmental
properties, like the EMC compatibility and thermal
characteristics, and the design and reliability issues. Section 6
deals with the testing and the calibration procedures and in
section 7 the mechanical and electrical interfaces are given. In
section 8 and 9 we address issues like manufacturing,
transportation and storage, in section 10 the requirements imposed
by the ASC on the system are given and to conclude we address the
financial issues (sect. 11) and we review the ASC specifications
against the SMART-1 requirements and provide the compliance
matrices (sect. 12).
M3 - Report
BT - Advanced Stellar Compass - Proposal for the SMART-1 Project
ER -