Remediation stop criteria

  • Kusk, Kresten Ole (Project Participant)
  • Bjerg, Poul Løgstrup (Project Participant)
  • Binning, Philip John (Project Manager)

    Project Details

    Description

    DTU will adress the major NorthPestClean project aim of developing measurable remediation stop criteria for the cleanup of Høfde 42 based om risk assessments of the site. Specifiically, DTU will provide:
    1) A risk assessment for the site including i) an assessment of the post cleanup contaminant flux leaching from thee site ii) an assessment of the transport pathways to the downstream receptor, here defined to be the North Sea iii) An assessment of the PEC (Predicted Environmental Concentration). PNEC (predicted No Effect Concentration) values in the North Sea oand ecological assessments will be based om existing information.
    2) Recommendations for remediation stop criteria for the site. These criteria will be based om the risk assessment and will define how to assess when acceptable clean up of the site has been achieved. Points of compliance will be identified and the relevant measurement/reporting parameters defined. The points of compliance are the locations and times at which to monitor remediation outcomes
    AcronymNorthPestClean
    StatusFinished
    Effective start/end date01/01/201131/12/2013