ELECTRA Top-Up

    Project Details

    Description

    The project will focus on derive and develop a concept of metrics for characterization of the state of the power system to be used as part of the information presented to operators in the control room.
    The concept will be experimentally tested in a control room decision support that will be required for the real time operation of the 2030 power systems, utilising visualisation and control features being investigated in ELECTRA Top-Up to ensure that the control room operator is provided with the optimal information of the state of the system and of the possible control actions to maintain the system in safe state.
    Enhance the usage of the existing experimental facilities SYSLAB (in Risø Campus) and ControlLab (in Lyngby Campus) along with Risø MV network (property of DONG Energy) so that proper measurement needs can be identified and controlling strategies be tested with real MV and LV meshed networks (Risø) and using the realistic visualization facility (Lyngby). Studies and testing are done having in mind both the needs of a real DSO.
    StatusFinished
    Effective start/end date01/11/201431/10/2017

    Funding

    • Energiteknologisk Udviklings- og Demonstrationsprogram

    UN Sustainable Development Goals

    In 2015, UN member states agreed to 17 global Sustainable Development Goals (SDGs) to end poverty, protect the planet and ensure prosperity for all. This project contributes towards the following SDG(s):

    • SDG 7 - Affordable and Clean Energy

    Keywords

    • smart grid
    • Power systems
    • Control System

    Fingerprint

    Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.