Project Details
Description
The Danish parts of WP3 are to perform a pre-feasibility study, including urban planning, environmental impact and capacity issues, for:
• Road and railway connections to the port of Esbjerg
• A intermodal terminal at port of Esbjerg
The main objective of the Danish part of WP3 is therefore to perform and report these Danish pre-feasibility studies. The secondary objective is to generate added value to the decision process associated with the pre-feasibility studies. This objective has been achieved by an innovative adaptation and application of cutting edge decision support systems to the pre-feasibility studies.
• Road and railway connections to the port of Esbjerg
• A intermodal terminal at port of Esbjerg
The main objective of the Danish part of WP3 is therefore to perform and report these Danish pre-feasibility studies. The secondary objective is to generate added value to the decision process associated with the pre-feasibility studies. This objective has been achieved by an innovative adaptation and application of cutting edge decision support systems to the pre-feasibility studies.
Status | Finished |
---|---|
Effective start/end date | 01/08/2006 → 01/11/2006 |
Collaborative partners
- Technical University of Denmark (lead)
- University of Southern Denmark (Project partner)
Funding
- Forsk. EU - Andre EU-midler
Keywords
- Composite model assessment
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.