Construction of Pearl-Chain Bridges

Project Details

StatusFinished
Effective start/end date01/02/201304/07/2016

Research Output

  • 1 Ph.D. thesis

Construction and Design of Post-Tensioned Pearl-Chain Bridges using SL-Technology

Halding, P. S., 2016, 222 p. (DTU Civil Engineering Report; No. R-350).

Research output: Book/ReportPh.D. thesisResearch

Open Access
File
1172 Downloads (Pure)