Real-time impact of power balancing on power system operation with large scale integration of wind power

Publication: Research - peer-reviewJournal article – Annual report year: 2016

Documents

DOI

View graph of relations

Highly wind power integrated power system requires continuous active power regulation to tackle the power imbalances resulting from the wind power forecast errors. The active power balance is maintained in real-time with the automatic generation control and also from the control room, where regulating power bids are activated manually. In this article, an algorithm is developed to simulate the activation of regulating power bids, as performed in the control room, during power imbalance between generation and load demand. In addition, the active power balance is also controlled through automatic generation control, where coordinated control strategy between combined heat and power plants and wind power plant enhances the secure power system operation. The developed algorithm emulating the control room response, to deal with real-time power imbalance, is applied and investigated on the future Danish power system model. The power system model takes the hour-ahead regulating power plan from power balancing model and the generation and power exchange capacities for the year 2020 into account. The real-time impact of power balancing in a highly wind power integrated power system is assessed and discussed by means of simulations for different possible scenarios.
Original languageEnglish
JournalJournal of Modern Power Systems and Clean Energy (Online)
Volume5
Issue number2
Pages (from-to)202-210
ISSN2196-5420
DOIs
StatePublished - 2017

Bibliographical note

© The Author(s) 2015. This article is published with open access at Springerlink.com

CitationsWeb of Science® Times Cited: 2
Download as:
Download as PDF
Select render style:
APAAuthorCBE/CSEHarvardMLAStandardVancouverShortLong
PDF
Download as HTML
Select render style:
APAAuthorCBE/CSEHarvardMLAStandardVancouverShortLong
HTML
Download as Word
Select render style:
APAAuthorCBE/CSEHarvardMLAStandardVancouverShortLong
Word

Download statistics

No data available

ID: 116853829