EMC of harmonic and transient measurement equipment in offshore wind farms

Publication: Research - peer-reviewConference article – Annual report year: 2011

Standard

EMC of harmonic and transient measurement equipment in offshore wind farms. / Kocewiak, Łukasz Hubert; Arana Aristi, Iván; Hjerrild, Jesper; Sørensen, Troels; Bak, Claus Leth; Holbøll, Joachim.

In: Energy Procedia, 2012.

Publication: Research - peer-reviewConference article – Annual report year: 2011

Harvard

APA

CBE

MLA

Vancouver

Author

Kocewiak, Łukasz Hubert; Arana Aristi, Iván; Hjerrild, Jesper; Sørensen, Troels; Bak, Claus Leth; Holbøll, Joachim / EMC of harmonic and transient measurement equipment in offshore wind farms.

In: Energy Procedia, 2012.

Publication: Research - peer-reviewConference article – Annual report year: 2011

Bibtex

@article{fe5820395d4248e691e5a67f9df051af,
title = "EMC of harmonic and transient measurement equipment in offshore wind farms",
keywords = "Transient measurements, EMI, EMC, Offshore wind farm, Harmonic measurements",
publisher = "Elsevier BV",
author = "Kocewiak, {Łukasz Hubert} and {Arana Aristi}, Iván and Jesper Hjerrild and Troels Sørensen and Bak, {Claus Leth} and Joachim Holbøll",
year = "2012",
journal = "Energy Procedia",
issn = "1876-6102",

}

RIS

TY - CONF

T1 - EMC of harmonic and transient measurement equipment in offshore wind farms

A1 - Kocewiak,Łukasz Hubert

A1 - Arana Aristi,Iván

A1 - Hjerrild,Jesper

A1 - Sørensen,Troels

A1 - Bak,Claus Leth

A1 - Holbøll,Joachim

AU - Kocewiak,Łukasz Hubert

AU - Arana Aristi,Iván

AU - Hjerrild,Jesper

AU - Sørensen,Troels

AU - Bak,Claus Leth

AU - Holbøll,Joachim

PB - Elsevier BV

PY - 2012

Y1 - 2012

N2 - The electromagnetic compatibility (EMC) and interference (EMI) challenges during the development, construction, testing and installation of a measurement system for multi-point, high-speed and long-term data logging is described in this paper. The presented measurement system was tested in a rough offshore environment at Avedøre Holme and Gunfleet Sands offshore wind farms. The paper clearly presents possible electromagnetic interference in wind turbines that can affect measurements. Also the application of appropriate mitigation techniques such as data acquisition board configuration, coaxial cable leading, as well as usage of EMC-proof boxes for high frequency measurements is described. Some measurement results focused on dealing with EMI are also presented and explained.

AB - The electromagnetic compatibility (EMC) and interference (EMI) challenges during the development, construction, testing and installation of a measurement system for multi-point, high-speed and long-term data logging is described in this paper. The presented measurement system was tested in a rough offshore environment at Avedøre Holme and Gunfleet Sands offshore wind farms. The paper clearly presents possible electromagnetic interference in wind turbines that can affect measurements. Also the application of appropriate mitigation techniques such as data acquisition board configuration, coaxial cable leading, as well as usage of EMC-proof boxes for high frequency measurements is described. Some measurement results focused on dealing with EMI are also presented and explained.

KW - Transient measurements

KW - EMI

KW - EMC

KW - Offshore wind farm

KW - Harmonic measurements

JO - Energy Procedia

JF - Energy Procedia

SN - 1876-6102

ER -