EMC of harmonic and transient measurement equipment in offshore wind farms
Publication: Research - peer-review › Conference article – Annual report year: 2011
Standard
EMC of harmonic and transient measurement equipment in offshore wind farms. / Kocewiak, Łukasz Hubert; Arana Aristi, Iván; Hjerrild, Jesper; Sørensen, Troels; Bak, Claus Leth; Holbøll, Joachim.
In: Energy Procedia, 2012.Publication: Research - peer-review › Conference article – Annual report year: 2011
Harvard
APA
CBE
MLA
Vancouver
Author
Bibtex
}
RIS
TY - CONF
T1 - EMC of harmonic and transient measurement equipment in offshore wind farms
A1 - Kocewiak,Łukasz Hubert
A1 - Arana Aristi,Iván
A1 - Hjerrild,Jesper
A1 - Sørensen,Troels
A1 - Bak,Claus Leth
A1 - Holbøll,Joachim
AU - Kocewiak,Łukasz Hubert
AU - Arana Aristi,Iván
AU - Hjerrild,Jesper
AU - Sørensen,Troels
AU - Bak,Claus Leth
AU - Holbøll,Joachim
PB - Elsevier BV
PY - 2012
Y1 - 2012
N2 - The electromagnetic compatibility (EMC) and interference (EMI) challenges during the development, construction, testing and installation of a measurement system for multi-point, high-speed and long-term data logging is described in this paper. The presented measurement system was tested in a rough offshore environment at Avedøre Holme and Gunfleet Sands offshore wind farms. The paper clearly presents possible electromagnetic interference in wind turbines that can affect measurements. Also the application of appropriate mitigation techniques such as data acquisition board configuration, coaxial cable leading, as well as usage of EMC-proof boxes for high frequency measurements is described. Some measurement results focused on dealing with EMI are also presented and explained.
AB - The electromagnetic compatibility (EMC) and interference (EMI) challenges during the development, construction, testing and installation of a measurement system for multi-point, high-speed and long-term data logging is described in this paper. The presented measurement system was tested in a rough offshore environment at Avedøre Holme and Gunfleet Sands offshore wind farms. The paper clearly presents possible electromagnetic interference in wind turbines that can affect measurements. Also the application of appropriate mitigation techniques such as data acquisition board configuration, coaxial cable leading, as well as usage of EMC-proof boxes for high frequency measurements is described. Some measurement results focused on dealing with EMI are also presented and explained.
KW - Transient measurements
KW - EMI
KW - EMC
KW - Offshore wind farm
KW - Harmonic measurements
JO - Energy Procedia
JF - Energy Procedia
SN - 1876-6102
ER -