DTU contributions to IEA Wind Annex 25 Phase 2

Publication: ResearchReport – Annual report year: 2012

Standard

DTU contributions to IEA Wind Annex 25 Phase 2. / Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Meibom, Peter.

DTU Wind Energy, 2012. 50 p. (DTU Wind Energy E; No. 0014).

Publication: ResearchReport – Annual report year: 2012

Harvard

Sørensen, PE, Cutululis, NA & Meibom, P 2012, DTU contributions to IEA Wind Annex 25 Phase 2. DTU Wind Energy. DTU Wind Energy E, no. 0014

APA

Sørensen, P. E., Cutululis, N. A., & Meibom, P. (2012). DTU contributions to IEA Wind Annex 25 Phase 2. DTU Wind Energy. (DTU Wind Energy E; No. 0014).

CBE

Sørensen PE, Cutululis NA, Meibom P 2012. DTU contributions to IEA Wind Annex 25 Phase 2. DTU Wind Energy. 50 p. (DTU Wind Energy E; No. 0014).

MLA

Vancouver

Sørensen PE, Cutululis NA, Meibom P. DTU contributions to IEA Wind Annex 25 Phase 2. DTU Wind Energy, 2012. 50 p. (DTU Wind Energy E; No. 0014).

Author

Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Meibom, Peter / DTU contributions to IEA Wind Annex 25 Phase 2.

DTU Wind Energy, 2012. 50 p. (DTU Wind Energy E; No. 0014).

Publication: ResearchReport – Annual report year: 2012

Bibtex

@book{7c2a3f00a6ce43c3bc6db7e51b8f03e9,
title = "DTU contributions to IEA Wind Annex 25 Phase 2",
publisher = "DTU Wind Energy",
author = "Sørensen, {Poul Ejnar} and Cutululis, {Nicolaos Antonio} and Peter Meibom",
note = "Contract no: 64009-0100; project no: 64009-0100; sponsor: Danish Energy Agency",
year = "2012",
series = "DTU Wind Energy E",

}

RIS

TY - RPRT

T1 - DTU contributions to IEA Wind Annex 25 Phase 2

A1 - Sørensen,Poul Ejnar

A1 - Cutululis,Nicolaos Antonio

A1 - Meibom,Peter

AU - Sørensen,Poul Ejnar

AU - Cutululis,Nicolaos Antonio

AU - Meibom,Peter

PB - DTU Wind Energy

PY - 2012

Y1 - 2012

N2 - The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of knowledge and experiences related to power system operation with large amounts of wind power and has actively followed parallel activities with Transmission System Operators other R&amp;D Task work. The participants have collected and shared information on the experience gained and the studies made up to and during the task. The case studies have addressed different aspects of power system operation and design, mainly: balancing, grid impacts and capacity credit of wind power.<br/>In the meetings, all participants have made presentations of the wind integration issues in their country, results so far and on-going activities. In the latest meetings presentations have been grouped to different topics to better dwell into the details of modelling challenges. In addition, there has been some telephone/web meetings for the journal articles and Recommendations report. In the Task 25 meetings, updates from other international work are also given (EU/TPWIND and SET-Plan, IEEE, IPCC). TSO collaboration is important for Task 25 work. There has been TSO participation in all meetings, with the participants from Canada, Denmark and Italy in most meetings and some other countries sending TSO participants in fewer meetings.

AB - The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of knowledge and experiences related to power system operation with large amounts of wind power and has actively followed parallel activities with Transmission System Operators other R&amp;D Task work. The participants have collected and shared information on the experience gained and the studies made up to and during the task. The case studies have addressed different aspects of power system operation and design, mainly: balancing, grid impacts and capacity credit of wind power.<br/>In the meetings, all participants have made presentations of the wind integration issues in their country, results so far and on-going activities. In the latest meetings presentations have been grouped to different topics to better dwell into the details of modelling challenges. In addition, there has been some telephone/web meetings for the journal articles and Recommendations report. In the Task 25 meetings, updates from other international work are also given (EU/TPWIND and SET-Plan, IEEE, IPCC). TSO collaboration is important for Task 25 work. There has been TSO participation in all meetings, with the participants from Canada, Denmark and Italy in most meetings and some other countries sending TSO participants in fewer meetings.

KW - DTU-Wind-Energy-Report-E-0014

KW - DTU-Wind-Energy-E-0014(EN)

BT - DTU contributions to IEA Wind Annex 25 Phase 2

T3 - DTU Wind Energy E

T3 - en_GB

ER -