Yi Ding

  1. 2015
  2. Published

    Review of Real-time Electricity Markets for Integrating Distributed Energy Resources and Demand Response. / Wang, Qi; Zhang, Chunyu; Ding, Yi; Xydis, George; Wang, Jianhui; Østergaard, Jacob.

    In: Applied Energy, Vol. 138, 2015, p. 695–706.

    Publication: Research - peer-reviewJournal article – Annual report year: 2014

  3. 2014
  4. Published

    A Multi-objective Model for Transmission Planning Under Uncertainties. / Zhang, Chunyu; Wang, Qi; Ding, Yi; Østergaard, Jacob.

    Proceedings of IEEE EPEC 2014. IEEE, 2014.

    Publication: Research - peer-reviewArticle in proceedings – Annual report year: 2014

  5. Published

    Congestion Management Strategies of Real-Time Market. / Wang, Qi; Zhang, Chunyu; Ding, Yi.

    In: Journal of Power and Energy Engineering, Vol. 2, 2014, p. 227-232.

    Publication: Research - peer-reviewJournal article – Annual report year: 2014

  6. Accepted
  7. Published

    Evaluation of nodal reliability risk in a deregulated power system with photovoltaic power penetration. / Zhao, Qian; Wang, Peng; Goel, Lalit; Ding, Yi.

    In: IET Generation Transmission and Distribution, Vol. 8, No. 3, 2014, p. 421-430.

    Publication: Research - peer-reviewJournal article – Annual report year: 2014

  8. Published

    FLECH - A Danish market solution for DSO congestion management through DER flexibility services. / Zhang, Chunyu; Ding, Yi; Nordentoft, Niels Christian; Pinson, Pierre; Østergaard, Jacob.

    In: Journal of Modern Power Systems and Clean Energy, Vol. 2, No. 2, 2014, p. 126-133.

    Publication: Research - peer-reviewJournal article – Annual report year: 2014

  9. Published

    Identification of kick-back from normal situations due to activation of flexible demand. / Han, Xue; Bindner, Henrik W.; Hansen, Henrik; Rasmussen, Kåre Seest; Cajar, Peder Dybdahl; Ding, Yi; Tackie, David Victor.

    iPower Consortium, 2014. 75 p.

    Publication: Research - peer-reviewReport – Annual report year: 2014

  10. Published

    Impact of equipment failures and wind correlation on generation expansion planning. / Pineda, S.; Morales, J.M.; Ding, Y.; Østergaard, J.

    In: Electric Power Systems Research, Vol. 116, 2014, p. 451-458.

    Publication: Research - peer-reviewJournal article – Annual report year: 2014

  11. Published

    Kick-back situations in distributions grids : iPower - WP 3.6. / Zhang, Chunyu; Ding, Yi; Cajar, Peder Dybdal; Østberg, Sisse Merete; Hansen, Henrik.

    iPower Consortium, 2014. 72 p.

    Publication: Research - peer-reviewReport – Annual report year: 2014

  12. Published

    MOPSO-based multi-objective TSO planning considering uncertainties. / Wang, Qi; Zhang, Chunyu; Ding, Yi; Østergaard, Jacob.

    Proceedings of IEEE PES ISGT Europe 2014:. IEEE, 2014.

    Publication: Research - peer-reviewArticle in proceedings – Annual report year: 2014

Previous 1 2 3 4 5 Next
Download list:
Download as PDF
Select render style:
APAAuthorCBEHarvardMLAStandardVancouverShortLong
PDF
Download as HTML
Select render style:
APAAuthorCBEHarvardMLAStandardVancouverShortLong
HTML
Download as Word
Select render style:
APAAuthorCBEHarvardMLAStandardVancouverShortLong
Word